Harting Primary School Early Years Area

Harting Primary approached Valley Projects to discuss developing an area used by the Early Years classes, which had fallen to disrepair over years of use and was in no way fulfilling its potential.

The vision Harting Primary had was for a highly versatile outdoor learning space offering all year round use. There was also a specific need for the area to have seamless surfacing to aid a pupil with motor and visual disability and consideration of colours to be used.

Following our initial consultation we worked with the staff to formulate an area which ticked all the boxes and within their budget.

Valley have been a pleasure to have working with us. They listened to our views and advised us well. We are really happy with the end product and the children love the space!

Products we were able to install within this scheme

  • Artificial Grass and Rubber Wet Pour Surfacing

  • Den making posts

  • Multi use Role Play Hut

  • Steel Mesh Water Wall with adaptable guttering

  • Mains Water Supply and Tap

  • Mud Pits with Wire & Pulley transport line

  • Role Play Shop front

  • Bespoke Sandpit with waterproof cover

  • Sleeper Planting Beds

It looks even better than the drawings!

Project Address

Harting Church of England Primary School, Tipper La, Petersfield GU31 5QT


Project Completed

January 2015